HONOLULU, HAWAII
InSynergy Engineering, Inc. completed a major renovation to all guest rooms and common areas in 2010. The guest room renovation included replacing air conditioning units, plumbing fixtures, upgrading power to the guest rooms, and providing new power throughout. Common area renovation included ball room air conditioning replacement and replacement of the domestic hot water heating system. In addition to the guest room and common area renovation completed in 2010, Insynergy Engineering has worked on many other renovations, repair, and upgrade projects at the hotel involving electrical, mechanical and fire protection work. Projects included design for the central chiller plant replacement, implementation of an energy efficient heat pump hot water heating system, and other miscellaneous projects including upgrade of the hotel fire alarm system, installation of dry cleaning exhaust hoods, replacement of the laundry hot water system, replacement of the central plant boiler, upgrade of the laundry steam system, renovation of the security office, replacement of hot water boiler, and air conditioning and electrical renovations to the ball room, lobby, pool restaurant, kitchen, and various meeting rooms. We also completed a due diligence study, assessing the mechanical and electrical conditions and completed an electrical load study and power quality study that was completed in September 2009. Estimated Construction Cost: $50 million