Board of Water Supply Beretania Building Air Conditioning Renovation
HONOLULU, HAWAII
Phase I includes the following: conduct a load analysis to verify cooling requirements for the building; monitor the chiller plant; evaluate existing electrical loads; conduct assessment of the existing air conditioning systems to determine replacement options; select major equipment components; provide budgets for each scheme analyzed; and meet with the Board of Water Supply (BWS) to select the most feasible air conditioning scheme that will meet the BWS functional and budgetary requirements.
Phase II includes developing a modified Design Build RFP based on the scheme selected, consisting of a narrative and conceptual and schematic drawings. The Division 1 and General requirements of the RFP will also be developed.
Phase III includes assisting BWS in reviewing the DB contractor’s technical proposals; providing briefing to the selection committee based on review findings; and provide clarifications to RFI’s generated by the contractors during the pricing phase.
Phase IV of this project includes reviewing DB design documents to ensure compliance with all RFP requirements; provide clarification to RFI’s generated by the Design Builder during the construction and design phase; review value engineering proposals, shop drawings and major equipment submittals to ensure compliance with RFP requirements; and conduct site visits to observe construction during key milestones.