Fort Shafter, Oahu Hawaii

FY08 MCA PN 61882 Barracks

We provided the mechanical, electrical, and fire protection engineering design work for plumbing, ventilation, air conditioning, fire protection, power and lighting for the Fort Shafter Barracks.  This includes providing a 156 unit Unaccompanied Enlisted Personnel Housing (UEPH) facilities to house single soldiers and to be similar to apartments.  The goal was to design the HVAC systems, service water heating, power, and lighting systems to achieve an energy consumption that is at least 30% below the consumption of a baseline building meeting the minimum requirements of ANSI/ASHRAE/ESNA Standard 90.1-2004.  Fort Shafter Barracks is the first LEED certified building for the Corps of Engineers Pacific Ocean Division at Fort Shafter.  Mechanical scope included full design of plumbing, ventilation, air conditioning systems, hot water systems, DDC energy management system, and CxA. Electrical work involved providing power, lighting, telephone, data and CATV systems, site electrical and telecom and mass notification system. Fire protection scope includes life safety analysis, addressable fire alarm, and QCFP services.

palm circle historic renovations

This project included providing a full interior renovation of 14 historic homes approximately 5,000 sf each, which included a survey and assessment, full design and construction management to completely replace all mechanical and electrical systems, including plumbing, ventilation, air conditioning, new electrical, fire alarm, data, and lighting systems. These single family residences were originally built in 1907 and are listed on the National Register of Historic Places, and designated as a National Landmark. Systems are being revitalized while maintaining the historic appearance. Estimated cost: $14 million.

[back to Portfolio: Federal]